Thursday 23 February 2017

SIMULATION OF A SOFTWARE TELECOMMUNICATION HANDSET



Abstract
Simulation of a software telecommunication handset is concerned with controlling traffic entry into a telecommunications network, so as to avoid congestive collapse by attempting to avoid oversubscription of any of the processing or link capabilities of the intermediate nodes and networks and taking resource reducing steps, such as reducing the rate of sending packets. It should not be confused with flow control, which prevents the sender from overwhelming the receiver. This work examines the multi-user resource allocation issue of GSM networks in Nigeria, the application, effects and the technology associated with it. A software based congestion control system for the resource allocation of GSM networks in MTN will be developed using visual basic 6.0.


CHAPTER ONE
INTRODUCTION
1.1           Background of the Study
The world is fast becoming a global village and a necessary tool for this process is communication of which telecommunication is a key player. The quantum development in the telecommunications industry all over the world is very rapid as one innovation replaces another in a matter of weeks. A major breakthrough is the wireless telephone system which comes in either fixed wireless telephone lines or the Global System of Mobile Communications (GSM). Communication without doubt is a major driver of any economy. Emerging trends in socio-economic growth shows a high premium being placed on information and communication technology (ICT) by homes, organizations, and nations.
Nigeria is not left out in this race for rapid development as the nation’s economy has been subjected to years of economic reversal via mismanagement and bad leadership. The Nigerian telecommunications sector was grossly underdeveloped before the sector was deregulated under the military regime of General Ibrahim Babangida in 1992 with the establishment of a regulatory body, the Nigerian Communication Commission (NCC). So far the NCC has issued various licenses to private telecommunications operator. These include 7 fixed telephony providers that have activated 90,000 lines, 35 Internet service providers with a customer base of about 17,000. Several VSAT service providers are in operation, and have improved financial intermediation by providing on-line banking services to most banks in Nigeria. These licenses allowed private telephone operators (PTOs), to roll out both fixed wireless telephone lines and analogue mobile phones. The return of democracy in 1999 paved the way for the granting of GSM license to 3 service providers: MTN Nigeria, ECONET Wireless Nigeria which is now called ZAIN and NITEL Plc which is now called ZOOM in 2001 and later GLO.

1.2    Statement of the Problem
It has been observed that calls across different networks are always difficult to connect, at times diverted and also attract more cost. This creates room for users to be confused as how much is deducted from their call credits or are compelled to having multiple GSM lines. As the network increases, more users makes call across different networks and there is need to record the call time, call network, and line identification and be able to put calls across the networks with out much congestions.
Transmission of calls requires at least two points, A and B (point-to-point; point-to-multipoint or multipoint-to-point). Consequently, the interconnectivity problem within Nigeria is simply stated as follows:
  1. How can A and B, separated possibly by thousands of kilometers within Nigeria, transmit voice to each other without each having to be subscribers to the same operator?
  2. More importantly, how can we ensure multi-user resource allocation such that if A is the originating consumer, it does not matter technologically (even if financially) which of ALL the other operators that B is a subscriber to, nor does it matter what type of transmission he or she is sending?
  3. The transmission of calls with out much congestion in the network.
This will form the bases for the project work.

1.3    Purpose of the Study
The purpose of this research work is to establish a transparent set of Interconnection Rules, which shall encompass at least the following requirements:
* Every operator must allow all other operators full interconnection to its network at technically feasible and convenient points of interconnection, such that traffic may originate on one network and terminate on another, or otherwise pass across networks, without interference, signal deterioration, delay, congestion, or restriction.
* To design software that will serve as a congestion control system for multi-user telecommunication networks.

1.4    Significance of the Study
This study will help us to know the status of GSM network resource allocation in Nigeria with a view to knowing areas to be addressed for better performance. This research work will aid telecommunication companies in Nigeria to achieve the following:
  1. Keep record of calls across the GSM networks.
  2. Use Interswitch to put calls through to the right designation without delay, distortions or diversion.
  3. Determine the calling network and receiving network and use this information for the purpose of interconnectivity tariffs.
  4. Maintain a database of all registered GSM lines for all GSM communication companies.

1.5    Aims and Objectives of the Study
Basically the aim of this project work is to design and simulate a multi-user telecommunication handset system for MTN.


1.6    Scope of the Project
This research covers network connectivity between two different GSM networks in Nigeria. The system covers all forms of voice calls across the network. Both call identification, recording and network interconnectivity.
1.7    Constraints and Limitations
Some of the constraints encountered during this project design include the following:
  • Financial Constraints: The design was achieved but not without some financial involvements. One had to pay for the computer time. Also the typing and planning of the work has its own financial involvements.  However, to solve the problems I solicited fund from guardians and relations.
  • High programming Technique: The programming aspect of this project posed a lot of problematic bugs that took me some days to solve. Problems such as the ADO, DAO and Jet Engine related run time errors. For instance, the Ms Access office 2000 edition does not work with VB-6. Jet Engine unless converted to lower version of Ms ACCESS of office 1997 edition (i.e. version 2.0). Also other technical problem, which requires semantic and syntactic approaches where encountered as well. In seeking for the solution to these problems, I acquired more knowledge from well –versed textbooks and programmes.
  • The epileptic nature of power supply cannot be overlooked.

1.8    Assumptions
It is assumed that all the data collected with respect to this research work are true representation of network communication system in MTN Nigeria.

1.9    Definition of Terms
Inter-switch: Inter-Switch Link (ISL) is a trunking method developed by Cisco to use for Ethernet and Token Ring trunk connections.
Air interface: In a mobile phone network, the radio transmission path between the base station and the mobile terminal.
Asymmetric Transmission: Data transmissions where the traffic from the network to the subscriber is at a higher rate than the traffic from the subscriber to the network.
SIM: Subscriber Identity Module; A smart card containing the telephone number of the subscriber, encoded network identification details, the PIN and other user data such as the phone book. A user’s SIM card can be moved from phone to phone as it contains all the key information required to activate the phone


HOW TO GET THE FULL PROJECT WORK

PLEASE, print the following instructions and information if you will like to order/buy our complete written material(s).

HOW TO RECEIVE PROJECT MATERIAL(S)
After paying the appropriate amount into our bank Account below, send the following information to
08140350866 or 08058580848

(1)    Your project topics
(2)     Email Address
(3)     Payment Name
(4)    Teller Number
We will send your material(s) immediately we receive bank alert

BANK ACCOUNTS
Account Name: AKINYEMI OLUWATOSIN
Account Number: 3022179389
Bank: FIRST BANK.

OR
Account Name: AKINYEMI OLUWATOSIN
Account Number: 2060566256
Bank: UBA.

OR
Account Name: AKINYEMI OLUWATOSIN
Account Number: 0042695344
Bank: Diamond

HOW TO IDENTIFY SCAM/FRAUD
As a result of fraud in Nigeria, people don’t believe there are good online businesses in Nigeria.

But on this site, we have provided “table of content and chapter one” of all our project topics and materials in order to convince you that we have the complete materials.

Secondly, we have provided our Bank Account on this site. Our Bank Account contains all information about the owner of this website. For your own security, all payment should be made in the bank.

No Fraudulent company uses Bank Account as a means of payment, because Bank Account contains the overall information of the owner

CAUTION/WARNING
Please, DO NOT COPY any of our materials on this website WORD-TO-WORD. These materials are to assist, direct you during your project.  Study the materials carefully and use the information in them to develop your own new copy. Copying these materials word-to-word is CHEATING/ ILLEGAL because it affects Educational standard, and we will not be held responsible for it. If you must copy word-to-word please do not order/buy.

That you ordered this material shows you have agreed not to copy word-to-word.


FOR MORE INFORMATION, CALL:
08058580848, 08140350866

YOU CAN ALSO VISIT:
www.achieverprojectmaterial.com
www.acheiversprojectmaterials.com
www.achieversprojectmaterials.com
www.naijasplash.com
www.achieversprojectmaterials.blogspot.com
www.achieverprojectmaterial.blogspot.com
www.acheiversprojectmaterials.blogspot.com
www.archieverprojectmaterials.blogspot.com
www.acheiversprojectmaterials.blogspot.com.ng
www.archieverprojectmaterials.blogspot.com.ng
www.achieversprojectmaterials.blogspot.com.ng
www.achieverprojectmaterial.blogspot.com.ng
www.achieverprojectmaterial.wordpress.com
www.achieversprojectmaterials.wordpress.com
www.acheiversprojectmaterials.wordpress.com
www.archieverprojectmaterials.wordpress.com





No comments:

Post a Comment